UAE: Mandarin Oriental Downtown Dubai has opened, situated throughout the Wasl Tower on Sheikh Zayed Street.
The 303-metre Wasl Tower has been designed by UNStudio and engineered by Werner Sobek.
With interiors by G.A Group, the Mandarin Oriental resort options 259 rooms and suites, in addition to 224 residences will launch in 2026 because the model’s first residential providing within the metropolis.
Facilities embody 10 eating venues, a rooftop helipad, a poolside terrace on the eleventh flooring, and a two-floor wellness providing with 9 remedy rooms, vitality swimming pools, expertise showers, saunas, steam rooms, and a health centre.
Greater than 2,000 sq. metres of versatile indoor house is offered for occasions, together with a ballroom and eight assembly rooms.
The resort joins Mandarin Oriental Jumeira, Dubai. Mandarin Oriental now operates 44 resorts, 12 residences and 26 properties throughout 27 international locations.
Highlights:
• Mandarin Oriental Downtown Dubai has opened throughout the 303-metre Wasl Tower on Sheikh Zayed Street.
• The resort presents 259 rooms and suites, with 224 residences set to launch in 2026 because the model’s first residential undertaking in Dubai.
• Facilities embody 10 eating venues, a rooftop helipad, poolside terrace, and a two-level wellness centre with remedy rooms and thermal experiences.
• The property options over 2,000 sq. metres of occasion house, together with a ballroom and eight assembly rooms.
• The opening marks Mandarin Oriental’s second resort in Dubai, increasing its world portfolio to 44 resorts throughout 27 international locations.

