Chinese language battery producer Gotion Excessive-Tech has accomplished a 0.2 GWh pilot manufacturing line, began in 2024, that has a 90% yield fee for its GEMSTONE all-solid-state battery.
The 2025 iteration demonstrates a 60% enchancment in sulfide electrolyte ion conductivity, 150% increased cell capability and 90% decreased stacking strain pre-tension pressure, the corporate mentioned. Its security has been validated by exams like nail penetration, crush check and thermal stability check. The corporate has additionally initiated street testing.
Gotion has not too long ago launched six new power merchandise. The lineup consists of the GEMSTONE all-solid-state battery, which has entered the pre-production section, the G-Yuan quasi-solid-state battery that has vary of 1,000 kilometers, the G-Collection batteries designed for 12-year use and a 20 MWh power storage system.
The G-Yuan battery delivers 300 Wh/kg power density, enabling EV ranges of over 1,000 km. Its adaptive solid-solid interface expertise ensures steady ion transport. A 3 mm metal nail penetration check confirmed its security. Gotion is at present constructing a 12 GWh manufacturing line and prototype automobiles are exceeding 10,000 km in street exams.

The G-series is a 116 kWh, high-capacity customary field for heavy-duty vehicles, delivering 175 Wh/kg particular power to assist megawatt-level ultra-fast charging and -40° C to 65° C temperature management vary. It reveals zero capability decay within the first 3,000 cycles, zero power loss over 1.2 million kilometers of driving and an ultra-long cycle lifetime of 12 years or 10,000 cycles, based on Gotion.
The Grid Q power storage system delivers 20 MWh capability per unit, backed by a 25-year design life. The modular design saves area whereas Air+Liquid cooling brings environment friendly thermal administration.
The Astroinno Gen-2 lithium manganese iron phosphate (LMFP) battery realizes 10-minute ultra-fast charging, 240 Wh/kg particular power and 93% cold-weather capability retention at -20° C. The battery passes the thermal runaway check on the PACK stage.
Supply: Gotion Excessive-Tech


