The Egyptian Electrical energy Transmission Firm (EETC) on 19 March signed-up Siemens Gamesa to construct, finance and function a 500MW wind farm on Egypt’s Gulf of Suez.
Egypt at present has 4.44GW of “new renewables” capability (excluding hydropower) in operation, break up between 2.25GW of photo voltaic and a pair of.19GW of wind. All of Egypt’s present wind capability is located within the Gulf of Suez with additions to extend that capability to three.03GW by the tip of this 12 months and to 4.33GW by the tip of 2027 additionally deliberate for the area (MEES, 16 August 2024). (CONTINUED – 129 WORDS)
Learn this text at no cost
Acquire entry to over 60-years of vitality evaluation and information
Delve into the small print backed by information
Unique info from high-level officers
Assess future dangers and alternatives

